East China Precision Equipment Manufacturer
Back to Case Studies
Manufacturing
10 weeks to launch

East China Precision Equipment Manufacturer

For bulk equipment exports, priority was given to capacity and loading efficiency. Planned trucking and pre-clearance improved on-time rates and reduced exception costs.

Client Background

Client ships 80+ TEU monthly from multiple East China ports to Europe and North America, involving high-value precision equipment requiring strict handling and timeline control.

Challenge

Peak season capacity wasn't guaranteed, port congestion caused detention; customs documents required multiple supplements; trucking and loading plans were fragmented with low coordination efficiency.

Solution Approach

1Main route capacity lock + backup routes in parallel, established capacity pool
2Daily scheduling for trucking, loading, customs, and release
3Customs document pre-review and high-value cargo securing solutions
4Port congestion contingency plans with priority handling

Implementation Process

Diagnosis & Planning

3 weeks
  • Analyzed shipping rhythm and cargo volume/weight profiles
  • Confirmed priority ports and routes, locked base capacity
  • Standardized customs document templates, delivered loading SOPs

Trial Run

3 weeks
  • Planned scheduling trial for 20 TEU
  • Exception timing and cost review, adjusted contingency plans
  • Enhanced securing and moisture protection to reduce damage

Full Rollout

4 weeks
  • Systematic trucking planning, locked trucks 48 hours in advance
  • Established priority exception channels with carriers
  • Monthly performance and cost transparency reports

Project Outcomes

On-time Rate & Stability

Stable capacity and daily scheduling significantly improved on-time delivery.

On-time Departure Rate
82%96%
14pt increase
Detention Fees
Baseline-65%
Decreased

Cost Optimization

Capacity pool and planned trucking reduced total costs and exception expenses.

Ocean Freight Cost
Baseline-9%
Decreased
Securing Damage
2.1%0.4%
Reduced by 1.7pt
"Planned scheduling and capacity locking finally made delivery predictable. Costs and milestones are much clearer, and customer satisfaction has improved significantly."
Chen Fei/Supply Chain Director